Question.4
A synchronous processing block has three register-to-register paths:
| Path | tCQ,max | tcomb,max | tsetup |
|---|---|---|---|
| Path A | 0.8 ns | 5.2 ns | 0.5 ns |
| Path B | 0.9 ns | 6.4 ns | 0.7 ns |
| Path C | 0.7 ns | 4.9 ns | 0.6 ns |
Ignore clock skew and uncertainty.
Which path limits the block, and what are the resulting minimum safe clock period and maximum clock frequency?
Digital circuits must deliver correct results at the correct time. This guide covers timing checks, clock control, reset, and clock-domain crossing. It focuses on practical circuit choices and common failures.
A synchronous path must produce correct data before the capture edge and keep it stable around that edge.
ββββββββββββ ββββββββββββββββ ββββββββββββ
ββββββββΊβ Launch βββββΊβ CombinationalβββββΊβ Capture ββββββββΊ
β Register β β Logic β β Register β
ββββββββββββ ββββββββββββββββ ββββββββββββ
β² β²
βββββββββββββββ Clock ββββββββββββββββ
| Timing path | From β To |
|---|---|
| Register-to-register | Launch register β Capture register |
| Input-to-register | Input β Register |
| Register-to-output | Register β Output |
| Input-to-output | Input β Output |
tCQ,max, tCQ,min β launch-register output delay.tcomb,max, tcomb,min β delay through logic.tsetup β data must arrive before the capture edge.thold β data must remain stable after the capture edge.For the basic zero-skew, zero-uncertainty register-to-register model:
Setup: TCLK β₯ tCQ,max + tcomb,max + tsetup
Hold: tCQ,min + tcomb,min β₯ thold
Arrival = tCQ,max + tcomb,max
Required = TCLK - tsetup
Setup Slack = Required - Arrival
Hold Slack = tCQ,min + tcomb,min - thold
Positive slack: pass; zero: boundary; negative: violation.
Example: TCLK=6 ns, tCQ,max=0.8 ns, tcomb,max=3.9 ns, tsetup=0.7 ns. Arrival = 4.7 ns; required = 5.3 ns; setup slack = +0.6 ns. With tCQ,min=0.25 ns, tcomb,min=0.35 ns, thold=0.80 ns, hold slack = β0.20 ns, so hold fails although setup passes.
The path requiring the longest clock period limits the operating frequency.
Reg A βββΊ Path 1 βββΊ Reg B
Reg C βββΊ Path 2 βββΊ Reg D
Reg E βββΊ Path 3 βββΊ Reg F
| Path | Required period |
|---|---|
| 1 | 4.6 ns |
| 2 | 6.1 ns |
| 3 | 5.2 ns |
Path 2 is critical: TCLK,min = 6.1 ns and Fmax(MHz) = 1000 / TCLK,min(ns) β 163.9 MHz.
| Skew | Setup margin | Hold margin |
|---|---|---|
| Positive | Increases | Decreases |
| Negative | Decreases | Increases |
With skew and uncertainty:
Setup Slack = TCLK + Skew - Setup_Uncertainty
- (tCQ,max + tcomb,max + tsetup)
Hold Slack = tCQ,min + tcomb,min - thold
- Skew - Hold_Uncertainty
Debug: setup failure β inspect maximum delay, period, skew, uncertainty. Hold failure β inspect minimum delay and clock relationship. Slowing the clock can help setup but does not normally repair same-clock hold.
Prefer one master clock with clock enables when only the update rate changes.
ββββββββββββββββββ
Data ββββββββββββΊβ β
Enable ββββββββββΊβ Register ββββββΊ Output
Clock βββββββββββΊβ with β
β Clock Enable β
ββββββββββββββββββ
Enable at active edge | Register action |
|---|---|
| 0 | Hold |
| 1 | Capture |
100 MHz Master Clock
Block A β Enable every cycle
Block B β Enable every 4 cycles
Both blocks remain in the 100 MHz clock domain; Block B updates every fourth cycle without a divided clock.
A direct Clock Β· Enable gate can generate shortened or extra pulses if Enable changes while the clock is HIGH. For positive-edge-triggered logic, a low-level-sensitive latch holds the gating enable during the HIGH phase.

Gated_Clock = Clock Β· Safe_Enable. The latch is transparent while Clock=0 and closed while Clock=1.
Technology choice: ASICs commonly use integrated clock-gating cells; FPGAs normally prefer dedicated enables or supported clock-control resources, not arbitrary fabric gates.
A generated clock is derived by division, multiplication, phase shift, or clock management. Timing analysis must know its frequency/phase relationship to the source; generated clocks are not automatically asynchronous.
A PLL manages clock frequency/phase; a DLL provides delay/phase alignment. A Locked indication signals that the intended relationship has been established.
Selecting live clocks with an ordinary combinational MUX risks extra or shortened pulses. Cross-coupled interlocks ensure break-before-make selection.
Select=0 chooses Clock_A; Select=1 chooses Clock_B.
Request_A = Select' Β· Enable_B'
Request_B = Select Β· Enable_A'

Gated_A = Clock_A Β· Enable_A
Gated_B = Clock_B Β· Enable_B
Clock_Out = Gated_A + Gated_B
The matching labels represent cross-coupled feedback: Enable_B' feeds Interlock AND A, and Enable_A' feeds Interlock AND B:
Enable_A β NOT β Enable_A'
Enable_B β NOT β Enable_B'
Each clock enable can assert only when the other is LOW. During an AβB switch:
Select β 1
β
Request_A β 0
β
Enable_A clears during the LOW phase of Clock_A
β
Request_B can become 1
β
Enable_B sets during the LOW phase of Clock_B
β
Clock_B drives Clock_Out
This preserves pulse integrity. Limitation: a stopped source may prevent its latch from reaching the safe phase, delaying or blocking the switch.
| Requirement | Preferred choice |
|---|---|
| Same clock, slower updates | Clock enable |
| Suppress ASIC clock activity | Integrated clock gating |
| Related new frequency/phase | Clock-management resource |
| Select between active clocks | Glitch-free clock selector |
If only the update rate changes,
prefer one master clock + clock enable.
Create or switch clocks only when
the architecture genuinely requires another clock relationship.
A reset design must define polarity, synchronous/asynchronous behavior, and priority. Active-LOW reset is named nReset (0 = asserted).
| Reset | Assertion | Deassertion |
|---|---|---|
| Synchronous | At active clock edge | At active clock edge |
| Asynchronous | Immediately | May occur between edges unless synchronized |
Example sequential priority:
nReset = 0 β Reset state
else Load = 1 β Load data
else Enable = 1 β Update / state transition
else β Hold
Reset must dominate Load and Enable if that priority is specified.
Recovery: reset is released sufficiently before the active clock edge. Removal: reset is not released too soon after it. A common strategy is asynchronous assertion with synchronous deassertion.

When nReset=0, both DFFs clear immediately. After release with adequate timing margin, the two-stage sequence is:
| Destination rising edge | Stage 1 | nReset_Sync |
|---|---|---|
| Before first | 0 | 0 |
| First | 1 | 0 |
| Second | 1 | 1 |
Thus nReset_Sync releases on the second destination edge in the defined sequence.

Each independent domain uses its own clock to synchronize reset release; do not reuse another domain's already-synchronized release.
Clock_A β controls release of nReset_A
Clock_B β controls release of nReset_B

Synchronization defines how release enters a domain; sequencing defines when it may occur. Dependencies include clock lock, initialization, memory/interface readiness, and prior-block readiness.
A reset tree distributes a high-fanout reset. A reset domain groups sequential elements sharing reset behavior and release policy.
| Symptom | First check |
|---|---|
| Registers release inconsistently | Asynchronous deassertion |
| One domain fails after release | Wrong domain clock/release sequence |
| Load/update wins over reset | Incorrect reset priority |
| Dependent block starts early | Reset sequencing |
A clock-domain crossing (CDC) occurs when one clock domain's signal is sampled by another.
| Clocks | Relationship |
|---|---|
| Same | Identical clock waveform |
| Related | Known frequency/timing relation |
| Phase-unrelated | Phase alignment cannot be relied upon |
| Asynchronous | No guaranteed frequency or phase relation |
An asynchronous transition close to a destination sampling edge can violate setup/hold and cause metastability.

A synchronizer reduces the likelihood of metastability propagating; it cannot eliminate it.

Both stages use Clock_B; downstream logic reads only DFF2. For an input stable before sampling, DFF1 updates on the first destination edge and Sync_Out on the second. Use this for independent single-bit levels, not pulses or related multi-bit words.
A pulse entirely between destination edges is missed:
Source Pulse: ___
| |
__________________| |________________
Clock_B: β β β
When pulse widening is permitted, stretch the pulse long enough to guarantee a destination sampling edge with adequate setup/hold margin.

The optional edge detector creates a one-cycle destination pulse; otherwise use the synchronized level. Events must be spaced far enough apart.
One event toggles a retained source state; the destination detects the synchronized change.

Source_Toggle β Source_Toggle'; Pulse_Dst = Sync_2 β Prev_Sync. Sync_1, Sync_2, and Prev_Sync are destination-clocked. Initialize Source_Toggle = Sync_1 = Sync_2 = Prev_Sync = 0 to prevent a false event after reset.
Event-rate limit: two source toggles before observation can cancel:
Source: 0 β 1 β 0
Destination: 0 ββββββ 0
When each event must be acknowledged before the next begins, use a two-way handshake:

Request crosses through destination synchronization; Acknowledge crosses back through source synchronization. A new request begins only after the source sees synchronized Acknowledge=0. This adds latency but provides completion confirmation.
| Need | CDC technique |
|---|---|
| Stable independent level | 2-FF synchronizer |
| Pulse may be widened | Pulse stretching |
| Occasional event without acknowledgement | Toggle synchronizer |
| Event requiring acknowledgement | Request/Acknowledge |
Coherency requires all related bits of a transferred word to represent the same transaction. Independent 2-FF synchronization of data bits can create mixed words:
Source change: 01 β 10
Possible incoherent observation: 00 or 11
For an occasional multi-bit word, the source holds Data stable while synchronized control determines destination capture.

The destination captures the held bus directly and only once; Request/Acknowledge controls use synchronizers. Source data must remain stable until acknowledgement, and a new transaction waits for handshake return-to-idle.
Adjacent legal source counter states change one Gray bit. Conversion:
Gray = Binary β (Binary >> 1)
| Binary | Gray |
|---|---|
00 | 00 |
01 | 01 |
10 | 11 |
11 | 10 |

The Gray value is registered in the source domain, then each bit passes through destination-clocked 2-FF synchronization. Remote pointer visibility is delayed. A slow destination may skip source states, so consecutive observations need not differ by one bit.
Boundary: Gray code is suitable for restricted counters/pointers, not arbitrary multi-bit data, and never replaces synchronization.
For continuous multi-bit streaming across independent clocks:

The data uses dual-port storage; each domain maintains its own binary pointer and receives a synchronized, registered Gray pointer from the other:
| Pointer sent | Destination synchronizer |
|---|---|
| Write Gray pointer β Read domain | Per-bit 2-FF, Read Clock |
| Read Gray pointer β Write domain | Per-bit 2-FF, Write Clock |
| Status flag | Calculated in | Remote information |
|---|---|---|
Full | Write domain | Synchronized read pointer |
Empty | Read domain | Synchronized write pointer |
The write side accepts writes only when Full = 0, and the read side accepts reads only when Empty = 0. Remote activity becomes visible after synchronization delay.
| Transfer | Preferred architecture |
|---|---|
| Independent level | 2-FF |
| Short event | Stretch or toggle |
| Acknowledged event | Request/Acknowledge |
| Multi-bit transaction | Stable-data handshake |
| Restricted pointer | Gray + synchronization |
| Continuous stream | Asynchronous FIFO |
Timing constraints define when transfers must meet their requirements, not how the hardware operates.

| Constraint intent | What analysis needs |
|---|---|
| Clock period | Interval between active edges |
| Input timing | Earliest/latest external arrival |
| Output timing | External receiver's data requirement |
| Generated clock | Source-derived frequency/phase relationship |
For example, TCLK=10 ns corresponds to 100 MHz. External I/O timing consumes part of the internal budget. Related generated clocks must be analyzed with their actual relationship.
| Exception | Legitimate case |
|---|---|
| False path | No valid timed transfer is required in the analyzed mode |
| Multicycle path | A real transfer is deliberately allowed later capture |
A test-only path inactive in the functional mode can be a false path. A multicycle path requires guaranteed suppression of the intermediate capture while the launched data remains valid:
Edge N β Launch data
Edge N + 1 β Destination capture guaranteed disabled
Edge N + 2 β Destination captures stable data
Multicycle exceptions must retain proper setup and hold checks. Never use an exception to conceal a real timing or CDC defect.
| Symptom | Inspect first |
|---|---|
| Data arrives too late | Setup: maximum delay, period, skew, uncertainty |
| Data changes during hold window | Hold: minimum delay, skew, clock relation |
| Extra or malformed clock edge | Gating or clock-source selection |
| Related-clock timing mismatch | Generated-clock relationship |
| Startup/one-domain reset failure | Reset polarity, priority, release sequence |
| Unreliable asynchronous level | Single-bit synchronizer |
| Missed/repeated event | Pulse width, toggle rate, reconstruction |
| Corrupted multi-bit word | Coherency or handshake |
Incorrect FIFO Full/Empty | Pointer synchronization and status ownership |
Start with the failing signal, its source/destination clocks, and the intended transfer. Fix the design or timing assumptionsβnot just the warning.