Loading simulator…
What is already provided
Clock_A and Clock_B are connected to their clock gates and LOW-phase latch controls.LATCH_A and LATCH_B already feed the enable outputs, source clock gates, and opposite-enable inverters.REQ_A and REQ_B outputs already connect to the corresponding latch D inputs.CLK_MERGE, STATE_FF, VCC, and nReset are fully connected. Leave these unchanged.What is missing
Both request AND gates have two unconnected input pins. Each gate needs one selection signal and one opposite-enable check to prevent both clock paths from being enabled together.
Complete the missing connections
NOT_SEL.out (Not Gate-3) → REQ_A.in0 (And Gate-1).NOT_SEL supplies SEL'. Clock A can be requested only when SEL = 0.NOT_EN_B.out (Not Gate-5) → REQ_A.in1 (And Gate-1).Enable_B' allows REQ_A only after B's stored enable becomes 0.SEL junction (Node-3) → REQ_B.in1 (And Gate-2).SEL signal allows Clock B to be requested only when SEL = 1.NOT_EN_A.out (Not Gate-4) → REQ_B.in0 (And Gate-2).Enable_A' allows REQ_B only after A's stored enable becomes 0.How the completed circuit works
REQ_A = SEL' · Enable_B'; REQ_B = SEL · Enable_A'.SEL.Enable_A = Enable_B = 0 interval is the intended break-before-make gap.GATE_A, GATE_B, and CLK_MERGE produce Clock_Out. The already-connected STATE_FF toggles on each rising edge that reaches this output.