The circuit already provides the master Clock, synchronous nReset, 2-bit Phase counter, state DFFs, reset gates, logic gates, fanout Nodes, and output indicators. Only the enable-generation and state-update connections are missing.

1. Connect Block A

Enable_A must be HIGH at Phase 01 and 11, which matches Phase0.

Connect:

Node-208-1 → Node-207-1
Node-207-2 → Xor Gate-12-in1

Node-207 now carries Enable_A to both the output indicator and the Block A update logic.

Feed the current state back into the XOR and route its result to the supplied reset gate:

Node-130-2 → Xor Gate-12-in0
Xor Gate-12-out → And Gate-23-in0

The XOR makes Block A hold when Enable_A = 0 and toggle when Enable_A = 1.

2. Connect Block B

Enable_B must be HIGH only at Phase 11, so the supplied AND gate must receive both Phase bits.

Connect:

Node-110-2 → And Gate-22-in0
Node-101-2 → And Gate-22-in1
And Gate-22-out → Node-120-0
Node-120-2 → Xor Gate-13-in1

Node-120 now carries Enable_B to both the output indicator and the Block B update logic.

Complete the Block B feedback path:

Node-140-2 → Xor Gate-13-in0
Xor Gate-13-out → And Gate-24-in0

This makes Block B hold when Enable_B = 0 and toggle when Enable_B = 1.

3. Final Operation

The completed logic is:

Enable_A = Phase0
Enable_B = Phase1 · Phase0

Both state DFFs still use the same master Clock. Therefore, Block A updates every 2 rising edges and Block B every 4 rising edges without creating another clock domain.